We offer key solutions for all your medical needs
Project goals are determined; A detailed analysis is made by considering functional and operational requirements and design limitations. A strategic concept plan is created by taking into account the risk elements identified during the analysis.
It is carried out systematically with the design and construction phases of the project. In this way, changes to the device planning are minimized.
The projects are carried out in parallel with the construction companies responsible for the construction of the hospital, and the equipment supply & installation is provided by the project and equipment experts.
Medical gas systems are of vital importance for the patient and the hospital, and it must be designed with zero error during the installation phase. In addition to the project design, the system is implemented properly.
The work to be done within the scope of the project is listed and a process report is prepared according to this and the report is constantly updated and reported. Possible delays are determined in advance and necessary measures are taken. It is updated according to your needs and demands.